HME Workshop
Time frame
7 weeks
Workforce
3 designer/drafter
Scope of work
3D modeling, design and fabrication package
Element quantities and tonnes
73977 parts, 668 t
HME Workshop
Weighting over 650 tones and containing over 70k parts, HME Workshops positions itself as our largest project we had worked on. It was also a project with a very tight deadline, and the structural input provided on the start date was only partially finished.
With proper organizing, our team managed to approach it efficiently and deliver the project on time. The model was divided into three segments and the three of our senior designers took one segment of the scope each. This way the main building columns and walls, main building roof, and offices and storage building, could be worked on simultaneously, and connected afterwards. Drawings were also approached simultaneously as portions of the model were finished.
Our team takes a holistic approach, considering both structural integrity and design aesthetics. The synergy between these aspects forms the backbone of our solutions.
Build your project with us, Make it world class
Our projects are born from a passion for innovation that knows no bounds.