 HME Workshop

Time frame

7 weeks

Workforce

3 designer/drafter

Scope of work

3D modeling, design and fabrication package

Element quantities and tonnes

73977 parts, 668 t

HME Workshop

Weighting over 650 tones and containing over 70k parts, HME Workshops positions itself as our largest project we had worked on. It was also a project with a very tight deadline, and the structural input provided on the start date was only partially finished.

With proper organizing, our team managed to approach it efficiently and deliver the project on time. The model was divided into three segments and the three of our senior designers took one segment of the scope each. This way the main building columns and walls, main building roof, and offices and storage building, could be worked on simultaneously, and connected afterwards. Drawings were also approached simultaneously as portions of the model were finished.

Our team takes a holistic approach, considering both structural integrity and design aesthetics. The synergy between these aspects forms the backbone of our solutions.

Testimonial

Dario Đurić

CEO

Shape

Build your project with us, Make it world class

Our projects are born from a passion for innovation that knows no bounds.

Book an appointment now
Please enable JavaScript in your browser to complete this form.
Name
Click or drag a file to this area to upload.